“Rodovia Transcerrados”, Highway PI 397: Demand, Engineering, Social/Environmental, Financial Assessment, and Legal Modeling Studies
Estimate costs to implement, maintain and operate Highway PI 397, as well as estimate revenues resulting from future user traffic, in order to assess economic-financial feasibility of the investment.
ACTIVITIES DEVELOPED
- Volumetric counts and origin-destination survey
- Determine average daily volumes at check points
- Determine origin/destination matrices for the baseline year
- Establish the economic growth scenario, considering expansion prospects of the planted area by product, production level, and product consumption in the area of influence of PI 397
- Determine future matrices and allocate them in a simulation model
- Determine volumes and tariff revenues for the concession’s timeline
- Analysis of the capacity and level of service for similar segments of the road
CASE STUDIES
- Technical Studies to Identify Infrastructure and Support Services for a Shopping Street Complex in Downtown São Paulo
- Concession Structuring Study for the 3rd Stage of Federal Highway Concessions, Phases II and III –Demand, Engineering, Environment, Financial and Legal Studies
- SP Ring Road: Traffic Projection Study for the West, South and East Segments
- “Rodovia Transcerrados”, Highway PI 397: Demand, Engineering, Social/Environmental, Financial Assessment, and Legal Modeling Studies
- Study of Demand, Business Model, Functional and Basic Design of Corridors and Stations in the BRT System of Dar es Salaam – Tanzania
- Design of the 1st BRT Corridor for the Metropolitan Area of Asunción – Paraguay