Study of Crowd Flows into the Beira Rio Stadium in Porto Alegre – RS
Check compliance with the requirements for holding the World Cup 2014, as presented in the Green Guide document, including firefighting requirements.
ACTIVITIES DEVELOPED
- Checking minimum and maximum dimensions allowed for certain elements of the architectural design (walkway widths, staircase configurations, etc.)
- Checking exit times in emergency situations and regular exits
- Designing security inspection equipment within the first control perimeter
- Designing ticket control equipment and checking time required to access the stadium
- Designing the new layout of bleachers and staircases to exit the stadium, in addition to determining the new capacity, together with the crowd studies team and the architects
- Definition, with Fifa’s local committee, of new assumptions and requirements for security and access controls in order to determine the design of equipment and required areas for large groups of people
CASE STUDIES
- Accessibility Study for the Maracanã Stadium Complex – RJ
- Belo Horizonte’s Mobility Operational Plan for FIFA Confederations Cup 2013 and FIFA World Cup Brazil 2014
- Updating the Strategic Transportation Plan for the Olympic and Paralympics Games in Rio de Janeiro, 2016
- Technical Studies to Identify Infrastructure and Support Services for a Shopping Street Complex in Downtown São Paulo
- Study of Crowd Flows into the Maracanã Stadium – RJ
- Study of Crowd Flows into the Beira Rio Stadium in Porto Alegre – RS