Operational Plan and Financial Modeling of the MyCiti BRT for Cape Town – South Africa
Design the entire BRT system for the city Project the progress of plan implementation and distribute implementation into stages Develop the Operational Plan detailed for Phase 1a
ACTIVITIES DEVELOPED
- Data collection and analysis (survey, counts, GPS-based mapping)
- Defining the detailed demand forecast model for the BRT system
- Forecasting passenger demand for the peak period of each station
- Study of the stages of the complete project into implementation phases (1a, 1b, 2, 3 and 4)
- Defining trunk/feeder services
- Defining the types of buses
- Estimating number of buses
- Estimating acquisition, operation and maintenance costs
- Definition, location and design of stations, terminals and depots
- Oversight of physical design
CASE STUDIES
- Operational Design of the Mass Transportation System of Santa Fé de Bogotá, Colombia: TransMilênio
- Progress Study of the Guadalajara (Mexico) BRT System, with Details and Assistance for Phase 1 Implementation – Macrobús
- Study of Demand, Business Model, Functional and Basic Design of Corridors and Stations in the BRT System of Dar es Salaam – Tanzania
- Operational Plan and Financial Modeling of the Rea Vaya BRT (Full and Phase 1a) for Johannesburg – South Africa