Operational Plan and Financial Modeling of the Rea Vaya BRT (Full and Phase 1a) for Johannesburg – South Africa

Project the progress of a complete system of BRTs, considering more than 120 km of bus corridors Develop the operational plan detailed for Phase 1a

ACTIVITIES DEVELOPED
  • Data collection and analysis (survey, counts, GPS-based mapping)
  • Defining the detailed demand forecast model for the BRT system
  • Forecasting passenger demand for the peak period of each station
  • Study of the phases of the complete project, divided into implementation phases
  • Defining trunk/feeder services
  • Defining the typology and fleet size
  • Definition, location and design of stations, terminals and depots
  • Oversight of physical design
  • Development of a detailed financial model